|

Transfer Revit Print Settings Between Projects

Revit Print Settings can be transferred between projects using Transfer Project Standards, which is useful for consistent office paper, zoom, appearance and processing rules.

Beginner takeaway: Transfer Print Settings as standards, but still verify the target project’s printer environment and title blocks.

What you need to understand first

The transferred object stores Revit output settings; it cannot guarantee that another workstation has the same physical printer, driver or media.

  • Autodesk supports transferring Print Settings through Transfer Project Standards.
  • Printing View/Sheet Sets are not transferred the same way.
  • Printer-driver availability can still differ by workstation.

Step-by-step workflow

Step 1 — Prepare source project

Where: Source model/template

Do this: Keep only approved named Print Settings.

Check: Source standard is clean.

Step 2 — Open target project

Where: Target model

Do this: Confirm title blocks/paper standards are compatible.

Check: Transferred settings will make sense.

Step 3 — Run Transfer Project Standards

Where: Manage tab

Do this: Select Print Settings according to office procedure.

Check: Named settings appear in target.

Step 4 — Resolve device differences

Where: Print Setup

Do this: Check printer/paper mappings on target workstation.

Check: No unavailable device/paper.

Step 5 — Test one sheet

Where: 100% PDF/hardcopy

Do this: Verify output before full issue.

Check: Transfer is proven.

What usually goes wrong

What you seeLikely layerFirst check
Setting transferred but printer missingLocal environmentMap approved device.
Paper differsDriver/media listChoose correct target paper.
Sheet set missingDifferent Revit objectRecreate View/Sheet Set.
Duplicate settingsUncontrolled standardsClean naming.

Practical example

A firm starts a new project from a consultant model that lacks office print standards. Transfer the approved `A1-PDF-100` and `A3-PDF-100` Print Settings, then verify one sheet each. Build project-specific View/Sheet Sets separately.

What not to do

  • Do not expect View/Sheet Sets to transfer with Print Settings.
  • Do not skip physical/PDF testing after a printer-driver change.
  • Do not transfer every experimental personal Print Setting from a working model.

Good office standard

Keep approved Print Settings in the office template/reference project and transfer only controlled names into active projects.

Quick verification before you move on

  1. Use one representative drawing or sheet, not a production batch.
  2. Verify page size, orientation and a known dimension.
  3. Compare Preview/PDF with the physical output when a printer is involved.
  4. Save the setting or set only after the result is repeatable.

Official references

Frequently asked questions

Can I transfer Revit Print Settings?

Yes, through Transfer Project Standards.

Will that transfer my selected sheet sets?

No. Printing View/Sheet Sets are project-specific.

Why retest after transfer?

The target workstation’s printer driver and paper options may differ.

Explore more in Revit Printing & PDF Guide.